Back to site

©2024. All rights reserved.
Crafted by 4Property.

Cushina Avenue


Price
€385,000

Type
Detached House

Status
For Sale

BEDROOMS
4

BATHROOMS
3

Description

https://drive.google.com/file/d/1HYZjPTfp4GR1YXe2gKrrKKmS01ym6THj/view?usp=drive_web

Cushina Avenue is a new upcoming residential development in Portarlington, Co. Laois, one of Portarlington’s most popular and well served neighbourhoods. Portarlington is a focal point of the Irish railway network, being situated on the junction for services to the west (Galway, Mayo), the south (Cork, Limerick, Tralee) and the east (Dublin, Kildare).

The house with its attractive shingle front is a spacious 4 bed- detached 133m2 with 3 Bath and a large south facing garden. Cushina homes have been designed to achieve an A2 building energy rating, boasting high efficiency electric, air to water heat pump. There are custom fitted kitchen units and all bathrooms are equipped with beautiful modern fixtures, fittings and tilling.
The kitchens are a timeless beauty, each to be eternally finished with K-rend monocouche render and stunning natural stone cladding. uPVC fitted windows , with high levels of floor and wall insulation and a composite front door ensuring energy efficiency by reducing heat. There are data and TV points, along with USB charging sockets, an external also a termination box outside for installing charging ports for electric vehicles.Cushina Homes are covered by HomeBond 10 year guarantee scheme.

The projects consist of 71 houses of various sizes:

· 7 Detached 4 Bedroom Houses
· 52 Semi-Detached 3 Bedroom Houses
· 6 End-Terrace 3 Bedroom Houses
· 6 Mid-Terrace 2 Bedroom Houses

These housing types are arranged to provide balanced landscapes, addressing a series of shared landscaped areas. The house types are oriented to maximise sunlight and all houses have large back gardens.

The Development Project includes 10% houses being constructed under the Part V division. The development would include both Timber Frame construction as well as Insulated Concrete Form methodology and the Construction is expected to start by the third quarter of 2023.

The development will take place in two phases and all the infrastructure works will be completed in Phase 1. The Model house will be constructed in Phase 1 so that all buyers can view the property and get clear ideas about the finishes of the property.

Key Challenges

Extra attention has been given towards the landscape and Ecological Impact of the development. Dunkeel Ltd gives environment safety priority during its development projects and has given priority towards retention of existing trees on the development site.

Register your Interest-

info@mattdunne.ie

Features

  • Walking Distance of Town Centre and all its amenities
  • Air To Water Heating System
  • A-Rated Energy Efficient.
  • New Home Guarantee Scheme
  • UPVC Doors and Windows
  • Maintenance Free Exteriors
  • Quality Sanitary Ware
  • Custom Fitted kitchen Units
  • Extra attention has been given towards the landscape and Ecological Impact of the development.
  • Retention of existing trees on the development site.

Directions

R32 E2HW Situated off the R419 i.e. the main Portarlington to Edenderry Road. 1km from Portarlington Town Centre.
Privacy Policy

Pagespeed Optimization by Lighthouse.